Link to Owner Dr. Robert B. Pamplin Jr.

FONT & AUDIO

MORE STORIES


$19.36 million in funds could help bolster five crucial infrastructure projects.

PMG FILE PHOTO - Tualatin Valley Highway in Aloha. The 19-mile corridor between Beaverton and Forest Grove has been designated as a high priority for projects funded by a proposed regional transportation bond that the Metro regional government is considering for November 2020., Beaverton Valley Times - News

Five high-profile projects in Northwest Oregon could be getting a financial kickstart, should a five-year transportation package make it to President Joe Biden's desk.

INVEST in America Act, which passed the House earlier this month, would provide $715 billion to update roads, bridges and public transportation across the country. This bipartisan bill is separate from the major infrastructure plan Biden has been touting since he took office.

U.S. Rep. Suzanne Bonamici secured $19.36 million within the transportation bill to go toward five transportation projects in Northwest Oregon. Bonamici represents Oregon's First Congressional District, which includes Washington, Yamhill, Clatsop and Columbia counties and part of Multnomah County.

"The INVEST in America Act addresses the infrastructure needs of NW Oregon and the country, helps mitigate the climate crisis, and creates good-paying jobs," Bonamici said in an emailed statement.

The Senate has until Oct. 1 to vote on the bill.

Here is a rundown of the five projects that could benefit from these federal infrastructure funds:

Beaverton Downtown Loop

A project in downtown Beaverton to widen sidewalks and expand pedestrian and transit access in predominantly low-income neighborhoods would receive $4 million under the infrastructure proposal.

The goal of the project is to make the city more walkable, by adding new protected bike lanes, pedestrian crossing treatments and bus stops to emphasize safety.

The Beaverton City Council has been advocating for federal funding to make the project happen.

Central Beaverton has undergone major revitalization over the past several years — including new apartment buildings, restaurants, hotels and even a food cart pod — leading to an uptick in foot traffic.



Tualatin Valley Highway

A 19-mile stretch of Highway 8, colloquially known as TV Highway, would receive $4 million for some long-overdue safety improvements. Much of the highway is poorly lit and lacks complete sidewalks in unincorporated Aloha and between Hillsboro and Cornelius.

The corridor has seen many high-profile crashes over the years — some of them fatal, such as when a Cornelius resident was struck and killed January 2020 while crossing the highway to catch the bus on her way to work.

Bonamici told Pamplin Media Group on June 3 that she would do all she could to "advocate for the project."

Past efforts to fund the project included a $5.4 billion bond measure that voters rejected last fall.



Newberg-Dundee Bypass

The Newberg-Dundee Bypass project is poised to receive $8 million as it heads toward its next phase.

Phase 1 of the project connected Highway 99W and Highway 219 in Yamhill County.

The Oregon Department of Transportation is in the process of designing Phase 2, which would extend the roadway at Highway 219 through the south side of Newburg.

Construction of Phase 2 is estimated to cost around $200 million, according to ODOT.

Pedestrian safety sidewalk in Warrenton

A pedestrian safety sidewalk project near Warrenton High School in Clatsop County would receive $1.36 million.

As of now, there is no dedicated walkway for students walking along Main Street between the grade school and the high school in Warrenton.

The project would also provide a separated, ADA-accessible walkway on the west side of Highway 104 and the ODOT right-of-way. Enhanced crosswalks would also be established on Highway 104 between the grade school and high school.

Safety improvements in downtown Portland

Downtown Portland would receive $2 million for safety improvements to ease traffic congestion and bus efficiency.

The Portland Bureau of Transportation has been working on a wide-reaching campaign called Central City in Motion. Projects within that campaign include streets, sidewalks, and bus and bicycle lanes throughout downtown Portland.

The $2 million would go toward improvements along Northwest and Southwest Broadway from Southwest Lincoln Street to Northwest Johnson Street. Improvements will include safer crossings, new streetlights, a protected bikeway amd smart traffic signals.

Rep. Earl Blumenauer also advocated for this project.


You count on us to stay informed and we depend on you to fund our efforts. Quality local journalism takes time and money. Please support us to protect the future of community journalism.

Go to top
JSN Time 2 is designed by JoomlaShine.com | powered by JSN Sun Framework