Link to Owner Dr. Robert B. Pamplin Jr.

FONT & AUDIO

MORE STORIES


The Portland Bureau of Transportation will install 80 concrete traffic-calming devices in neighborhood greenways.

PMG PHOTO: ZANE SPARLING - The Portland Bureau of Transportation is installing Slow Street concrete planners in 80 locations across the city. A pandemic-inspired program designed to keep harried drivers off neighborhood streets will be sticking around for the long haul.

It's been 15 months since the Portland Bureau of Transportation first planted orange barrels and barriers along 100 miles of low-traffic streets as part of the Slow Streets initiative to discourage cut-through cars and reserve the roads for pedestrians and cyclists amid a virus lockdown.

PBOT now plans to replace those traffic-calming signs with permanent installations made of concrete in 80 locations across the city.

"Slow Streets have been a cornerstone of PBOT's COVID-19 response since the beginning of the pandemic," said Commissioner Jo Ann Hardesty, who oversees the bureau. "I am pleased that we are continuing to invest in the programs that have been proven effective."

Officials told the Tribune the temporary program has cost about $75,000 so far, while the permanent batch of concrete barrels and planters is budgeted at $200,000 for construction and another $50,000 for engineering and administration.

The planters are labeled with 15 MPH signs and cost about $1,500 to $3,200 each.

Most of the concrete structures — they are not diverters that close off routes, but instead prompt drivers to slow down — will be placed in the middle of the road by city maintenance crews this summer and fall. A "mid-fall" timeline for completion is in place, but crews are often pulled away to make emergency repairs, PBOT said.

"We are starting with the first 80 locations and will be listening to community feedback before determining how we might expand beyond those initial locations," said PBOT spokeswoman Hannah Schafer.

The city said 'Slow Streets' must be located on neighborhood greenways, and are also targeted for areas that are lacking sidewalks; more than quarter mile from open space or parks; located near multi-family housing; or with higher traffic volume that makes pedestrian access challenging.


Zane Sparling
Reporter
971-204-7865
email: This email address is being protected from spambots. You need JavaScript enabled to view it.
Follow me on Twitter


You count on us to stay informed and we depend on you to fund our efforts. Quality local journalism takes time and money. Please support us to protect the future of community journalism.


RELATED STORIES

- Hardesty slams PBOT contractor with 'thin blue line' flag

- PBOT to spend $4 million on Fremont Street upgrades

- Red Electric Bridge work finally underway

- PBOT completes $10M bike and pedestrian bridge over I-405

- PBOT: Pandemic stress contributed to fatal crashes

- PBOT launches $11M pedestrian project in East Portland

- PBOT recommends making Portland e-scooter system permanent

- PBOT's 'business plazas' bloom in Sellwood and Westmoreland


Go to top
JSN Time 2 is designed by JoomlaShine.com | powered by JSN Sun Framework